# Director of Technical Program Management, Physical Deployment at Nscale

Nscale is hiring a Director of Technical Program Management, Physical Deployment in San Francisco and Seattle, United States. It pays $290k-$350k a year and Level rates it Little AI ●○○○; you can [apply on Nscale](https://jobsbylevel.com/go/a7736738-c6fe-45fc-a843-5a0b892ccf1a?utm_medium=ai-agent).

AI Level 1, AI centrality 24 out of 100. San Francisco; Seattle.

## Details

- Company: [Nscale](https://jobsbylevel.com/companies/nscale)
- AI level: AI Level 1 (score 24 out of 100)
- Location: San Francisco; Seattle
- Salary: $290k-$350k
- Posted: November 2, 2026
- Apply: https://jobsbylevel.com/go/a7736738-c6fe-45fc-a843-5a0b892ccf1a?utm_medium=ai-agent
- Free CV review for this job: https://jobsbylevel.com/cv-review?job=director-of-technical-program-management-physical-deployment-at-nscale-d6a9fd

## Description

About Nscale Nscale builds and operates large-scale AI infrastructure, delivering GPU clusters for leading hyperscalers, AI labs and enterprises across North America, EMEA and APAC. The Deployment PMO turns signed contracts into live AI infrastructure, coordinating the many teams and partners involved in bringing large GPU clusters online. About the role As Director of Physical Deployment, you own every cluster from data center early access through to the point where every GPU rack is powered on, cabled and passing hardware acceptance testing. You will turn construction, power, cooling and supply chain realities into schedules the business can commit to, and hold partners to them. Your scope begins when Nscale takes handover of the data hall and ends when the racks are ready for logical bring-up. It covers site readiness, rack receipt and placement, power and cooling activation, structured cabling, and vendor-led hardware testing. You will hand a clean, fully documented floor to the Logical Deployment team for network configuration, validation and customer handoff. This is a field leadership role. Expect to spend 90% or more of your time travelling, leading from the data center floor. What you’ll do Own physical delivery Own the integrated physical schedule for each cluster, covering data center early access, rack delivery, power, cooling, cabling and hardware acceptance testing. Set and defend milestone dates. Build in buffer, and escalate early when float disappears. Run daily and weekly site cadences with data center partners, OEMs (such as Dell, Lenovo and Supermicro), cabling vendors and onsite teams. Maintain rack-level tracking so leadership can see exactly where every rack stands and manage supply and site risk. Track GPU, rack, switch, transceiver and cabling materials against need dates, working with Supply Chain and BOM specialists. Work with data center partners on power and cooling readiness, including primary cooling loops, phased energization and temporary solutions. Lead recovery plans when supply, construction or vendor staffing slips, including re-sequencing work, re-routing hardware and adding resources. Lead people and partners Lead, hire and develop a team of Physical Deployment TPMs, with clear ownership for each site. Hold vendors accountable to SOWs, staffing plans and quality standards. Hand off cleanly to Logical Deployment, with complete documentation, punch lists and test results. Build the operating model Define the physical deployment playbook, including entry criteria, gates, checklists and standard timelines. Partner with the tooling team on automation for rack tracking, cabling verification and status reporting. Report weekly status and risks to the VP and senior leadership, clearly separating forecast from upside. What success looks like in your first 6–12 months Every active cluster has one integrated physical schedule, owned by a named TPM and reviewed weekly. Physical milestones hit their committed dates, or slips are flagged at least two weeks ahead with a recovery plan. Rack-level status is visible to leadership without manual chasing. A documented physical deployment playbook is in use on every new site. Logical Deployment receives floors with no open blockers at handoff. The Physical Deployment team is fully staffed, with clear site ownership and a succession path. What you bring 12+ years in data center, hyperscale infrastructure or large-scale hardware deployment, including 5+ years leading teams. Direct experience delivering multi-megawatt GPU or HPC clusters, from data hall readiness through rack energization. Working knowledge of data center power, liquid and air cooling, structured cabling and rack integration. A track record of managing OEMs, data center operators and construction partners to firm commitments. Strength in building integrated schedules and critical paths across many parties, and in recovering them when they slip. Clear, concise executive communication, both in

The description is cut here. Read the full offer: https://jobsbylevel.com/jobs/director-of-technical-program-management-physical-deployment-at-nscale-d6a9fd

Source: https://jobsbylevel.com/jobs/director-of-technical-program-management-physical-deployment-at-nscale-d6a9fd

## Cite this page

Level. https://jobsbylevel.com/jobs/director-of-technical-program-management-physical-deployment-at-nscale-d6a9fd.

Get job alerts: https://jobsbylevel.com/newsletter
