# Senior Onsite Technical Program Manager - Data Center Deployment at Nscale

Nscale is hiring a Senior Onsite Technical Program Manager - Data Center Deployment. It pays $160k-$300k a year and Level rates it Little AI ●○○○; you can [apply on Nscale](https://jobsbylevel.com/go/27795088-5f7c-491e-9d61-a771e0025529?utm_medium=ai-agent).

AI Level 1, AI centrality 30 out of 100. US.

## Details

- Company: [Nscale](https://jobsbylevel.com/companies/nscale)
- AI level: AI Level 1 (score 30 out of 100)
- Location: US
- Salary: $160k-$300k
- Posted: May 14, 2026
- Apply: https://jobsbylevel.com/go/27795088-5f7c-491e-9d61-a771e0025529?utm_medium=ai-agent
- Free CV review for this job: https://jobsbylevel.com/cv-review?job=senior-onsite-technical-program-manager-data-center-deployment-at-nscale-edc0d9

## Description

About Nscale and the Deployment PMO Nscale builds and operates large-scale AI infrastructure, delivering GPU clusters for leading hyperscalers, AI labs and enterprises across North America, EMEA and APAC. The Deployment PMO turns signed contracts into live AI infrastructure, coordinating the many teams and partners involved in bringing large GPU clusters online. About the role The Onsite Technical Program Manager is Nscale’s owner on the data center floor. You drive a cluster from data center early access until racks are energized and ready for logical bring-up, and you track the state of every rack along the way. You turn construction, power, cooling and supply chain realities into a daily plan, and you hold partners to it. Your scope starts when the data hall is handed to Nscale and ends when every GPU rack is powered on, cabled and passing hardware acceptance testing. It covers site readiness, rack receipt and placement, power and cooling activation, structured cabling, and vendor-led hardware testing. You hand a clean, documented floor to the Logical Deployment team for network configuration, validation and customer handoff. This is an individual contributor role reporting to the Director, Physical Deployment. It is a field role, so expect to spend 90% or more of your time on site, working from the data center floor. What you’ll do Own the site schedule Own the physical schedule for your site: data center early access, rack delivery, power, cooling, cabling and hardware acceptance testing. Track and defend milestone dates. Flag early when float disappears, with a recovery option ready. Run daily stand-ups on site with data center partners, OEMs (such as Dell, Lenovo and Supermicro), cabling vendors and onsite crews. Keep rack-level status current, so leadership can see exactly where every rack stands. Manage supply and site risk Track GPU, rack, switch, transceiver and cabling material arriving on site against need dates, with Supply Chain and bill of materials (BOM) specialists. Work with data center partners on power and cooling readiness, including primary cooling loops, phased energization and temporary solutions. Drive recovery on site when supply, construction or vendor staffing slips, re-sequencing work, re-routing hardware and escalating for resources. Hold partners to the plan Verify vendor work against statements of work (SOWs), staffing plans and quality standards, and raise gaps the same day. Walk the floor daily and confirm progress first-hand, not from vendor reports alone. Hand off cleanly to Logical Deployment, with complete documentation, punch lists and test results. Improve how we deploy Follow the physical deployment playbook, and feed back what works and what doesn’t after every site. Help the tooling team shape automation for rack tracking, cabling verification and status reporting. Report daily and weekly status and risks to the Director, Physical Deployment, clearly separating forecast from upside. What success looks like in your first 6–12 months Your site runs on one integrated physical schedule, reviewed daily on the floor and weekly with leadership. Physical milestones hit their committed dates, or slips are flagged at least two weeks ahead with a recovery plan. Rack-level status for your site is current and visible without manual chasing. Logical Deployment receives your floors with no open blockers at handoff. You have contributed at least one improvement to the physical deployment playbook. What you bring 7+ years in data center, hyperscale infrastructure or large-scale hardware deployment, with substantial time on site. Hands-on delivery of GPU or HPC clusters, from data hall readiness through rack energization. Working knowledge of data center power, liquid and air cooling, structured cabling and rack integration. A track record of holding OEMs, data center operators and construction partners to firm commitments. Strength in building and running detailed site schedules and critical paths,

The description is cut here. Read the full offer: https://jobsbylevel.com/jobs/senior-onsite-technical-program-manager-data-center-deployment-at-nscale-edc0d9

Source: https://jobsbylevel.com/jobs/senior-onsite-technical-program-manager-data-center-deployment-at-nscale-edc0d9

## Cite this page

Level. https://jobsbylevel.com/jobs/senior-onsite-technical-program-manager-data-center-deployment-at-nscale-edc0d9.

Get job alerts: https://jobsbylevel.com/newsletter
